Mineral water is a fast moving consumer product in summer. The production of mineral water is not intended to be a good business in summer. A small mineral water production line needs to be established.
First of all, the site should be large and large, such as 2000 bottles of drinks or water per hour. The minimum factory should be 600 square meters and close to the water source.
The following points should be paid attention to when running the mineral water production line:
1. The mineral water is filtered by water treatment equipment and reverse osmosis equipment, totaling 40000 to 60000.
2. Filling machine. If the required daily output is 1000 pieces and overtime production is available, 1000-1500 bottles/hour rotary filling line is enough. Generally, small mineral water filling enterprises will choose the filling machine of Chenyu Machinery. The after-sales service is complete, and the optional equipment can be customized according to requirements.
3. Equipment materials and key components. In order to be durable, the equipment must be made of 304 or 316 stainless steel. In addition, pipes, valves, pumps, etc. need to be better used, which has a low failure rate.
4. Bottle blowing machine: Blowing mineral water bottles is the first link of the production line. The quality of the equipment directly affects the work of subsequent equipment. In case of failure, the entire production line will stop running.
5. Labeling machine and packaging machine: Labeling, packaging and packing of produced mineral water bottles
6. The height of the workshop is more than 4 meters, and the area is more than 700 square meters (one line).
7. The automatic beverage filling production equipment can be obtained at about 300000 yuan, but the auxiliary facilities are expensive, such as plant reconstruction, capping machine, personnel disinfection facilities, cleaning workshop, laboratory, etc. It is estimated that 300000 yuan is required for insurance.
8. In addition, rent and petty cash also need at least 300000 yuan for preparation.
9. Therefore, it needs at least 1 million yuan to open a beverage factory that can make stable quality and maintain its survival.
10. It should be noted that once started, there is no turning back. Investors in small beverage enterprises often focus only on equipment investment costs, ignoring the late fees and time costs such as supporting facilities, auxiliary facilities, start-up costs, QS application, customized molds, employee industrial injury insurance, packaging design, plate making, recruitment, training, trial production, etc. More than two sets of plans and emergency measures shall be formulated and implemented cautiously.
The mineral water production line of Chenyu Machinery is self-developed by adopting foreign advanced technology and combining the characteristics of China. It has adopted a large number of new technologies, new processes and new structures. It has excellent quality.
The neck of the bottle is stuck between the bottle fixing plate and the upper forming plate, and the bottle is clamped up and down by the clamp driven by the star wheel, thus realizing the three processes of cleaning, filling and sealing. In addition, all parts of the mineral water filling equipment in contact with the liquid are made of 304 stainless steel or food engineering plastics, with wear resistance and oxidation resistance.
Most of its electrical systems use imported parts. The machine has standard food hygiene, stable and reliable performance, low failure rate, full automatic control and perfect after-sales service, and is very popular with customers at home and abroad. It is the ideal equipment for various beverage manufacturers.
Related news