The bottle carbonated beverage filling production line is an advanced level of isostatic filling machine equipment based on the requirements of China’s beverage filling process, introducing, digesting and absorbing foreign advanced technology.
Washing part is mainly composed of washing pump, bottle clamps, water distributor, up turn-plate, guide rail, protection cover, spraying device, defrosting tray, rinse water take and rinse water refluxing tank.
Filling Part is mainly composed of filling barrel, filling valves (normal temperature and normal pressure filling), filling pump, bottle hanging device / bottle pedestals, elevating device, liquid indicator, pressure gauge, vacuum pump, etc
Capping part is mainly composed of capping heads, cap loader (separated), cap unscrambler, cap drop rail, pressure regular, cylinder and also we need an air compressor as the auxiliary external equipment.
Leave a Reply